A long run drains through a limited outlet arrangement
The useful comparison is the runoff assigned to each outlet, not a universal count of downspouts per house. Ask for the roof-area and rainfall assumptions, the proposed outlet location and the gutter’s drainage direction. A new downspout may require an alignment change so the intended section actually drains to it. Have the contractor explain why the existing arrangement is inadequate before agreeing to a new opening.
Notice next: Request a sketch showing which roof surfaces feed each existing and proposed outlet.